Home/Projects

Our Projects

Every project we deliver is executed under Aramco's 9COM standards, ensuring the highest levels of quality, safety and compliance in the oil and gas industry.

Active Projects

Current Projects

12 active projects under Aramco 9COM standards.

01
Amiral PV1 - Package 4 - Utilities, Flare & Interconnecting System (STA4)
ContractorHyundai Engineering & Construction
9COM Number6000002521
ScopeDesign, Fabrication & Supply CS Pressure Vessels
Quantity12 Nos.
Feb 2024 – Ongoing
02
Amiral PV2 - Package 4 - Utilities, Flare & Interconnecting System (STA4)
ContractorHyundai Engineering & Construction
9COM Number6000002522, 6000002523
ScopeCS & SS Pressure Vessels
Quantity13 Nos.
Feb 2024 – Ongoing
03
Amiral - Package 2 Derivatives
ContractorTecnimont Arabia Co. Ltd.
9COM Number6000002521, 6000002522
ScopeCS Pressure Vessels
Quantity8 Nos.
Mar 2024 – Ongoing
04
Amiral - Package 2 Derivatives
ContractorTecnimont Arabia Co. Ltd.
9COM Number6000002521
ScopeCS Pressure Vessels
Quantity4 Nos.
Mar 2024 – Ongoing
05
Amiral - Package 3 HDPE Units & Logistic
ContractorTecnimont Arabia Co. Ltd.
9COM Number6000002521, 6000002522
ScopeCS Pressure Vessels
Quantity7 Nos.
Mar 2024 – Ongoing
06
Upgrade Sulfur Recovery Units (SRU) – Yanbu Refinery
ContractorGS Construction Arabia Co. Ltd.
9COM Number6000002309
ScopeChemical Injection Skids
Quantity1 No.
May 2024 – Ongoing
07
Tanajib Expansion Airport (PKG#8)
ContractorAtlas Copco Saudi Arabia
9COM Number6000002521
ScopeCS Pressure Vessels
Quantity1 No.
May 2024 – Ongoing
08
Amiral - Package 3 HDPE Units & Logistic
ContractorTecnimont / ARAMCO
9COM Number6000002521
ScopeDesign, Fabrication & Supply Pressure Vessels
Quantity7 Nos.
Jun 2024 – Ongoing
09
Upgrade Water Injection Facility - Harmaliyah
ContractorAtlas Copco Saudi Arabia / Technip Energies / ARAMCO
9COM Number6000002521
ScopeAir Dryer Skid & Air Generation Package
Quantity1 No.
May 2024 – Ongoing
10
Riyas NGL Fractionation Facilities – Pkg 1 & Pkg 2
ContractorHadetec B.V. / Tecnicas Reunidas
9COM Number6000002461
ScopeNitrogen Generation Skid Package
Quantity1 No.
Oct 2024 – Ongoing
11
Debottleneck Production Facilities – Abqaiq GOSP-2,3,5,6
ContractorAtlas Copco Saudi Arabia / ENPPI
9COM Number6000002879
ScopeAir Dryer Skid Package
Quantity4 Nos.
Feb 2025 – Ongoing
12
Debottleneck Production Facilities – Abqaiq GOSP-2,3,5,6
ContractorAtlas Copco / ENPPI / ARAMCO
9COM Number6000002461
ScopeNitrogen Generation Skid Package
Quantity9 Nos.
Feb 2025 – Ongoing
Delivered

Completed Projects

72 successfully delivered projects.

Found 0 projects

No Projects Found

Try adjusting your search terms.

01Bechtel

Supply & Erection of steel structures, piping, Equipment, vessels, stacks, E&I and miscellaneous works to complete the smelter project (Material handling System)

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Feb 2011 – May 2014
Completed
02Covent Fans Inc, Canada

Supply, fabrication and delivery to site of static parts 24 Nos. for Industrial Fans

Quantity: 24 Nos.

Ma'aden Aluminum Plant, Ras Al Khair
Mar 2011 – Apr 2012
Completed
03PSA 2000, Solios International, England

Construction & Installation works of 15 nos. Holding & melting Furnaces

Quantity: 15 Nos.

Ma'aden Aluminum Plant, Ras Al Khair
May 2011 – Dec 2013
Completed
04PSA 2000, Solios International, England

Supply, fabrication and delivery to site of 2 nos. side wall furnaces for rolling mill

Quantity: 2 Nos.

Ma'aden Aluminum Plant, Ras Al Khair
Dec 2011 – Sep 2012
Completed
05Linde / Dealim, Korea

Supply, fabrication and delivery to site of various pipe supports for entire piping project

Quantity: L/S

Arabian Chior Vinyl project, Jubail
Jan 2012 – May 2012
Completed
06Bechtel

EPC of Truck loading station includes: structure, piping, and equipment

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Aug 2012 – Mar 2013
Completed
07Ma'aden Aluminum, Jubail, KSA

Erection & Modification of structures, ducting and piping works as per client requirements

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Sep 2013 – May 2014
Completed
08Ma'aden Aluminum, Jubail, KSA

Modification of entire Gantry bus rail system as per client requirements

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Oct 2013 – Mar 2014
Completed
09Unilube Oil Company, Jubail, KSA

EPIC of CS Site Fabricated Asphalt Storage Tank of size 9.2 M Dia x 9.0 M Ht

Quantity: 1 No.

Lube Oil Production Plant, Jubail, KSA
Nov 2013 – Apr 2014
Completed
10Coperion GmbH, Germany

PIC (Procurement, Construction & Installation) works of Additional Sun shades

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Nov 2013 – Mar 2014
Completed
11Unilube Oil Company, Jubail, KSA

TPI Pre Inspection & Demolishing of Asphalt Storage Tank of size 11M Dia x 10.7M H

Quantity: 1 No.

Lube Oil Production Plant, Jubail, KSA
Nov 2013 – Jan 2014
Completed
12Ma'aden Aluminum, Jubail, KSA

Plant Modification & Repair Work

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Dec 2013 – Jul 2014
Completed
13Hanver Services, Belgium

Erection of 32 nos. Exchange Funnels

Quantity: 32 Nos.

Ma'aden Aluminum Plant, Ras Al Khair
Jan 2014 – May 2014
Completed
14Unilube Oil Company, Jubail, KSA

EPIC of CS Site Fabricated Asphalt Storage Tank with Insulation of size 11M Dia x 10.7M Ht

Quantity: 1 No.

Lube Oil Production Plant, Jubail, KSA
Feb 2014 – Oct 2014
Completed
15Nasser Al Hajri Corporation, Jubail, KSA

PIC (Procurement, Construction & Installation) works of SS 304 Fluid Bed Drier Ducting for 2 Furnaces

Quantity: 2 Nos.

SADARA Chemical Plant, Jubail, KSA (ARAMCO)
May 2014 – Oct 2015
Completed
16Unilube Oil Company, Jubail, KSA

EPIC of CS Site Fabricated Base Oil Storage Tanks 2 Nos. of size 10M Dia x 9.8M HT

Quantity: 2 Nos.

Lube Oil Production Plant, Jubail, KSA
Oct 2014 – May 2015
Completed
17Unilube Oil Company, Jubail, KSA

EPIC of Vacuum Column with Site Modification & Column Replacement works (LMTK)

Quantity: L/S

Lube Oil Production Plant, Jubail, KSA
Mar 2015 – May 2015
Completed
18Coperion GmbH, Germany

Modification & Repair Works

Quantity: L/S

Ma'aden Aluminum Plant, Ras Al Khair
Jan 2015 – Apr 2015
Completed
19Unilube Oil Company, Jubail, KSA

PIC of Piping works for new Vacuum Column

Quantity: 1 No.

Lube Oil Production Plant, Jubail, KSA
Apr 2015 – Jul 2015
Completed
20Petrofac Saudi Arabia Ltd

Site Erection & Welding works of CS / SS / AS Piping – (ARAMCO)

Quantity: L/S

Petrorabigh Plant (ARAMCO), KSA
Jun 2015 – Oct 2016
Completed
21Petrofac Saudi Arabia Ltd

Supply, shop fabrication, galvanizing and site erection of pipe supports

Quantity: 200 MT.

Petrorabigh Plant (ARAMCO), KSA
Dec 2015 – Jul 2016
Completed
22Unilube Oil Company, Jubail, KSA

EPIC of 1000 Cu. Mtr Cap. Oil Storage Tank

Quantity: 1 No.

Lube Oil Production Plant, Jubail, KSA
May 2016 – Sep 2016
Completed
23Sulzer Middle East

EPIC of SS 316 Ti & CS columns of 6 Nos. with inside packing erection

Quantity: 6 Nos.

Unilube Expansion Project
Aug 2016 – Feb 2017
Completed
24Unilube Oil Company, Jubail, KSA

EPIC of SS 316 Ti & CS vessels

Quantity: 16 Nos.

Unilube Expansion Project
Aug 2016 – Feb 2017
Completed
25Unilube Oil Company, Jubail, KSA

LSTK of Expansion of Lube Oil Plant (Steel Structures + Piping + E&I & Erection of Client Supply Equipment)

Quantity: L/S

Unilube Expansion Project
Sep 2016 – Aug 2017
Completed
26Unilube Oil Company, Jubail, KSA

LSTK of Utility House Boiler Project (Steel Structures + Piping + E&I & Erection of Boiler & Chiller units)

Quantity: L/S

Unilube Utility Expansion Project
Feb 2017 – Jul 2017
Completed
27SABIC (IBN SINA) / Dragados Gulf Construction

Heat Exchanger Nozzle Modification with "R-Stamp" (Including calculation, Fabrication & Testing)

Quantity: L/S

IBN SINA Polyoxylene Project, Jubail
Apr 2017 – May 2017
Completed
28ARAMCO / AES Arabia

EPC (Design & Detailed Engineering, Procurement, Fabrication, Testing & U-Stamp Inspection of SS Filters)

Quantity: 6 Nos.

Fuel Gas Conditioning Skid Package Train 1–6, Riyadh
May 2017 – Jun 2018
Completed
29ARAMCO

EPC (Design & Detailed Engineering, Procurement, Fabrication, Testing of SS ISO Vessel)

Quantity: 2 Nos.

Tanajib Project, KSA
Oct 2017 – Apr 2018
Completed
30SABIC / Pall Corporation

EPC (Design & Detailed Engineering, Procurement, Fabrication, Testing of CS Vessel)

Quantity: 3 Nos.

Petro Kemya Project, Jubail
Dec 2017 – Jun 2018
Completed
31ARAMCO / SAIPEM / SOFINTER S.P.A

Shop Fabrication of CS Pressure Vessels / Deaerators

Quantity: 4 Nos.

Khurais Facilities Expansion Project
Nov 2017 – Dec 2018
Completed
32Unilube Oil Company, Jubail, KSA

EPIC of Structure Design, Supply, Fabrication & Erection Works

Quantity: L/S

United Lube Oil Plant, Jubail
Jan 2018 – Jun 2018
Completed
33Yammama / GAS Arabia / PALL Corp

CS Pipe Spool Fabrication (Yamama limits)

Quantity: L/S

Yamama Cement, Riyadh
Jan 2018 – May 2018
Completed
34Yammama / GAS Arabia / PALL Corp

Erection / Installation of Skid Assembly Works at PSIC Workshop

Quantity: L/S

Yamama Cement, Riyadh
Jan 2018 – Aug 2018
Completed
35ARAMCO / GAS Arabia / PALL Corp

CS Pipe Spool Fabrication (ARAMCO Limits)

Quantity: L/S

ARAMCO Yamama, Riyadh
Apr 2018 – Oct 2018
Completed
36ARAMCO / GAS Arabia / PALL Corp

Erection / Installation of Skid Assembly Works at PSIC Workshop (ARAMCO Limits)

Quantity: L/S

ARAMCO Yamama, Riyadh
Apr 2018 – Nov 2018
Completed
37ARAMCO / MASTER GAS / SEPC

EPC of CS Sand Trap

Quantity: L/S

SEPCO Plant, Riyadh
Jul 2018 – Mar 2019
Completed
38ARAMCO / Hashim Al Mosowi Con. Est

Painting works of Pipe Spools

Quantity: L/S

South Dhahran Home Ownership Project - Ajyal
Aug 2018 – Nov 2018
Completed
39ARAMCO / EPPM - Tunisian Saudi for Projects

Supply of Shop Tank - 2 Nos.

Quantity: 2 Nos.

Water Injection Plant #3, Uthmaniyah A
Nov 2018 – Aug 2020
Completed
40ARAMCO / ZEECO Middle East Ltd

Fabrication of Steel Structure & Pipe Spools

Quantity: L/S

Ras Tanura Refinery
Jan 2019 – Jan 2020
Completed
41ARAMCO / ZEECO Middle East Ltd

Skid Assembly Works

Quantity: 1 No.

Ras Tanura Refinery
Apr 2019 – Aug 2020
Completed
42ARAMCO / AYTB / TR KSA

Shop Fabrication of Pipe Supports

Quantity: L/S

Ras Tanura Refinery
Apr 2019 – Nov 2019
Completed
43M/s PALL / ARAMCO

Fabrication & Assembly Works of Black Powder Filtration Skid

Quantity: 1 No.

Gas Pipeline to SPARK & Dammam Industrial City-3
May 2020 – Apr 2021
Completed
44M/s PALL / ECC / ARAMCO

Fabrication & Assembly Works of Liquid / Liquid Coalescer Filters Skids

Quantity: 2 Nos.

KGP – Khursaniyah Gas Plant Project
Jun 2020 – Aug 2021
Completed
45SINOPEC / ARAMCO

EPC – Engineering, Supply & Fabrication of Closed Drain System Drums

Quantity: 2 Nos.

MPIP – Package 16, Tanajib Area Pipelines
Jun 2020 – Apr 2021
Completed
46SINOPEC / ARAMCO

EPC; Engineering, Supply & Fabrication of Closed Drain System Drums

Quantity: 4 Nos.

MPIP – Package 16, Ju'aymah & North Terminal
Jun 2020 – Apr 2021
Completed
47Aramco

EPC; Engineering, Supply & Fabrication of Nitrogen Tank Vaporizer Skid

Quantity: 1 No.

Udhailiyah B-568 Project, Saudi Aramco
Jun 2020 – Jun 2021
Completed
48BARTON FIRTOP / ARAMCO

EPC; Engineering, Supply & Fabrication of Crude Basket Strainer Vessels

Quantity: 2 Nos.

Increase East West Pipe Lines Capacity Package
Jan 2021 – Sep 2021
Completed
49ECC / Veolia Middle East

Design, Fabrication & Supply of Steel Structure

Quantity: 400 Tons.

Veolia Value Park Plant, Jubail
Jun 2021 – Apr 2022
Completed
50Gardner Denver Deutschland GmbH (NASH) / ARAMCO

EPC; Engineering, Supply & Fabrication of Gas/Liquid Separator

Quantity: 1 No.

Ras Tanura II, Saudi Aramco
Jul 2021 – Sep 2022
Completed
51Air Pack / ARAMCO

EPC; Engineering, Supply & Fabrication of Receiver Vessels for PSA Skid

Quantity: 2 Nos.

Abu Ali Project, Saudi Aramco
Jul 2021 – Mar 2024
Completed
52Atlas Copco / Sinopec / ARAMCO

Design, Supply, Fabrication & Assembly Works of Instrument Air Dryer Skid Package

Quantity: 11 Nos.

Upgrade Crude Oil – East West Pipeline
Aug 2021 – Sep 2023
Completed
53MA'ADEN Aluminum

Retubing of Shell & Tube Heat Exchangers

Quantity: 2 Nos.

Refurbishment of Six Export Heat Exchanger, Ras Al Khair
Dec 2021 – Apr 2023
Completed
54Chromalox / McDermott / ARAMCO

Design, Supply, Fabrication of Heater Casing / Pressure Vessel

Quantity: 2 Nos.

Marjan Incremental Program, Saudi Aramco
Jan 2022 – May 2023
Completed
55Aramco

Design, Supply, Fabrication of Sand Trap / Pressure Vessel

Quantity: 2 Nos.

8" HRML-809 Water Supply Lateral, Aramco
Apr 2022 – Dec 2023
Completed
56Alderley / Hyundai / Aramco

Design, Supply, Fabrication of ATM. Storage Tanks

Quantity: 2 Nos.

MIP PKG06 – Onshore Oil Facility Project
Apr 2022 – Apr 2023
Completed
57KENT PLC / Aramco

Design, Supply, Fabrication of Chemical Injection Skid

Quantity: 1 No.

Umm Wuaal Satellite Processing 01
Apr 2022 – Apr 2023
Completed
58Chemanol Methanol Chem. Company

Design, Supply, Fabrication of Shell & Tube Heat Exchanger

Quantity: 1 No.

Turnaround - 2023 - Chemanol, Jubail
May 2022 – Apr 2023
Completed
59Hyundai / ARAMCO

Design, Fabrication & Supply of Steel Structure Skid

Quantity: 225 Tons.

Marjan Increment Program Package-06
Apr 2022 – Jan 2024
Completed
60Aramco

EPC, Engineering, Supply & Fabrication of 01 No Gas Recovery Buffer Vessel

Quantity: 1 No.

Harath, Midrikah Building 906, Saudi Aramco
Jun 2022 – Jul 2023
Completed
61Chemanol

EPC, Engineering, Supply & Fabrication of 01 No Stainless-steel Heat Exchanger

Quantity: L/S

Chemanol Plant Jubail
Jun 2022 – Jul 2023
Completed
62Hyundai / ARAMCO

Mechanical Design, Detail Engineering, Procurement, Shop Fabrication, Painting & Delivery of Pressure Vessel

Quantity: 25 Nos.

Jafurah Utilities Sulfur, Al Hofuf
Jul 2022 – Ongoing
Completed
63SICIM / SWCC

CS Vessel

Quantity: 1 No.

Sales Gas Fuel Supply for SWCC Yanbu (Phase 3)
Sep 2022 – Nov 2023
Completed
64Advance Precision Services

Design, Fabrication of Tanks

Quantity: 7 Nos.

Potable and Irrigation Surge Package
Sep 2022 – Nov 2023
Completed
65AL-SAGHYIR / ARAMCO

CS Vessel

Quantity: 4 Nos.

JEC-2000 Home Lot Development, Package-8
Nov 2022 – Jan 2024
Completed
66Atlas Copco / JGC / ARAMCO

Air Dryer Skid Package

Quantity: 3 Nos.

Zuluf AH Development Program On-Shore Oil Facility
Dec 2022 – Feb 2025
Completed
67Atlas Copco / JGC / ARAMCO

Air Dryer Skid Package

Quantity: 2 Nos.

Jafurah Utilities Al Hofuf
Dec 2022 – Oct 2024
Completed
68Alderley / Aramco

Design, Fabrication & Supply Pressure Vessels

Quantity: 2 Nos.

Tanajib Gas Plant Package 9 & 11
Aug 2023 – Apr 2025
Completed
69Gardner Denver Deutschland GmbH (NASH) / ARAMCO

EPC; Engineering, Supply & Fabrication of Gas/Liquid Separator

Quantity: 2 Nos.

Fadhili FGRU Project, Saudi Aramco
Dec 2023 – Completed
Completed
70SISCO / ARAMCO

Portable Mobile MEG Spool and Blowdown Skids

Quantity: 12 Nos.

Jafurah Gas Wells Tie-in Project
Mar 2024 – Oct 2025
Completed
71Atlas Copco / L&T / ARAMCO

Air Dryer Skid Package

Quantity: 6 Nos.

Jafurah Gas Compression Project-Phase II
Jul 2024 – Sep 2025
Completed
72Atlas Copco / L&T / ARAMCO

Nitrogen Generation Skid Package

Quantity: 3 Nos.

Jafurah Gas Compression Project-Phase II
Jul 2024 – Sep 2025
Completed
Our Clients

Clients & End Users

Saudi Aramco
SABIC
Maaden
Sadara
SATORP
Bechtel
Atlas
Hyundai Engineering
Petro Rabigh
Tecnimont Arabia
Samsung Engineering
JGC
Farabi
AES
Pall
V-Line
Jacobs
Kent
SISCO
Técnicas Reunidas
SNC-Lavalin
Veolia
Saipem
Technip
Barton
RCJY
Sinopec
Airpack
Worley
NPCC
ENPPI
GSC
Hadetec

Have a Project in Mind?

Our engineering team is ready to discuss your fabrication requirements.