Every project we deliver is executed under Aramco's 9COM standards, ensuring the highest levels of quality, safety and compliance in the oil and gas industry.
12 active projects under Aramco 9COM standards.












72 successfully delivered projects.
Try adjusting your search terms.
Supply & Erection of steel structures, piping, Equipment, vessels, stacks, E&I and miscellaneous works to complete the smelter project (Material handling System)
Quantity: L/S
Supply, fabrication and delivery to site of static parts 24 Nos. for Industrial Fans
Quantity: 24 Nos.
Construction & Installation works of 15 nos. Holding & melting Furnaces
Quantity: 15 Nos.
Supply, fabrication and delivery to site of 2 nos. side wall furnaces for rolling mill
Quantity: 2 Nos.
Supply, fabrication and delivery to site of various pipe supports for entire piping project
Quantity: L/S
EPC of Truck loading station includes: structure, piping, and equipment
Quantity: L/S
Erection & Modification of structures, ducting and piping works as per client requirements
Quantity: L/S
Modification of entire Gantry bus rail system as per client requirements
Quantity: L/S
EPIC of CS Site Fabricated Asphalt Storage Tank of size 9.2 M Dia x 9.0 M Ht
Quantity: 1 No.
PIC (Procurement, Construction & Installation) works of Additional Sun shades
Quantity: L/S
TPI Pre Inspection & Demolishing of Asphalt Storage Tank of size 11M Dia x 10.7M H
Quantity: 1 No.
Plant Modification & Repair Work
Quantity: L/S
Erection of 32 nos. Exchange Funnels
Quantity: 32 Nos.
EPIC of CS Site Fabricated Asphalt Storage Tank with Insulation of size 11M Dia x 10.7M Ht
Quantity: 1 No.
PIC (Procurement, Construction & Installation) works of SS 304 Fluid Bed Drier Ducting for 2 Furnaces
Quantity: 2 Nos.
EPIC of CS Site Fabricated Base Oil Storage Tanks 2 Nos. of size 10M Dia x 9.8M HT
Quantity: 2 Nos.
EPIC of Vacuum Column with Site Modification & Column Replacement works (LMTK)
Quantity: L/S
Modification & Repair Works
Quantity: L/S
PIC of Piping works for new Vacuum Column
Quantity: 1 No.
Site Erection & Welding works of CS / SS / AS Piping – (ARAMCO)
Quantity: L/S
Supply, shop fabrication, galvanizing and site erection of pipe supports
Quantity: 200 MT.
EPIC of 1000 Cu. Mtr Cap. Oil Storage Tank
Quantity: 1 No.
EPIC of SS 316 Ti & CS columns of 6 Nos. with inside packing erection
Quantity: 6 Nos.
EPIC of SS 316 Ti & CS vessels
Quantity: 16 Nos.
LSTK of Expansion of Lube Oil Plant (Steel Structures + Piping + E&I & Erection of Client Supply Equipment)
Quantity: L/S
LSTK of Utility House Boiler Project (Steel Structures + Piping + E&I & Erection of Boiler & Chiller units)
Quantity: L/S
Heat Exchanger Nozzle Modification with "R-Stamp" (Including calculation, Fabrication & Testing)
Quantity: L/S
EPC (Design & Detailed Engineering, Procurement, Fabrication, Testing & U-Stamp Inspection of SS Filters)
Quantity: 6 Nos.
EPC (Design & Detailed Engineering, Procurement, Fabrication, Testing of SS ISO Vessel)
Quantity: 2 Nos.
EPC (Design & Detailed Engineering, Procurement, Fabrication, Testing of CS Vessel)
Quantity: 3 Nos.
Shop Fabrication of CS Pressure Vessels / Deaerators
Quantity: 4 Nos.
EPIC of Structure Design, Supply, Fabrication & Erection Works
Quantity: L/S
CS Pipe Spool Fabrication (Yamama limits)
Quantity: L/S
Erection / Installation of Skid Assembly Works at PSIC Workshop
Quantity: L/S
CS Pipe Spool Fabrication (ARAMCO Limits)
Quantity: L/S
Erection / Installation of Skid Assembly Works at PSIC Workshop (ARAMCO Limits)
Quantity: L/S
EPC of CS Sand Trap
Quantity: L/S
Painting works of Pipe Spools
Quantity: L/S
Supply of Shop Tank - 2 Nos.
Quantity: 2 Nos.
Fabrication of Steel Structure & Pipe Spools
Quantity: L/S
Skid Assembly Works
Quantity: 1 No.
Shop Fabrication of Pipe Supports
Quantity: L/S
Fabrication & Assembly Works of Black Powder Filtration Skid
Quantity: 1 No.
Fabrication & Assembly Works of Liquid / Liquid Coalescer Filters Skids
Quantity: 2 Nos.
EPC – Engineering, Supply & Fabrication of Closed Drain System Drums
Quantity: 2 Nos.
EPC; Engineering, Supply & Fabrication of Closed Drain System Drums
Quantity: 4 Nos.
EPC; Engineering, Supply & Fabrication of Nitrogen Tank Vaporizer Skid
Quantity: 1 No.
EPC; Engineering, Supply & Fabrication of Crude Basket Strainer Vessels
Quantity: 2 Nos.
Design, Fabrication & Supply of Steel Structure
Quantity: 400 Tons.
EPC; Engineering, Supply & Fabrication of Gas/Liquid Separator
Quantity: 1 No.
EPC; Engineering, Supply & Fabrication of Receiver Vessels for PSA Skid
Quantity: 2 Nos.
Design, Supply, Fabrication & Assembly Works of Instrument Air Dryer Skid Package
Quantity: 11 Nos.
Retubing of Shell & Tube Heat Exchangers
Quantity: 2 Nos.
Design, Supply, Fabrication of Heater Casing / Pressure Vessel
Quantity: 2 Nos.
Design, Supply, Fabrication of Sand Trap / Pressure Vessel
Quantity: 2 Nos.
Design, Supply, Fabrication of ATM. Storage Tanks
Quantity: 2 Nos.
Design, Supply, Fabrication of Chemical Injection Skid
Quantity: 1 No.
Design, Supply, Fabrication of Shell & Tube Heat Exchanger
Quantity: 1 No.
Design, Fabrication & Supply of Steel Structure Skid
Quantity: 225 Tons.
EPC, Engineering, Supply & Fabrication of 01 No Gas Recovery Buffer Vessel
Quantity: 1 No.
EPC, Engineering, Supply & Fabrication of 01 No Stainless-steel Heat Exchanger
Quantity: L/S
Mechanical Design, Detail Engineering, Procurement, Shop Fabrication, Painting & Delivery of Pressure Vessel
Quantity: 25 Nos.
CS Vessel
Quantity: 1 No.
Design, Fabrication of Tanks
Quantity: 7 Nos.
CS Vessel
Quantity: 4 Nos.
Air Dryer Skid Package
Quantity: 3 Nos.
Air Dryer Skid Package
Quantity: 2 Nos.
Design, Fabrication & Supply Pressure Vessels
Quantity: 2 Nos.
EPC; Engineering, Supply & Fabrication of Gas/Liquid Separator
Quantity: 2 Nos.
Portable Mobile MEG Spool and Blowdown Skids
Quantity: 12 Nos.
Air Dryer Skid Package
Quantity: 6 Nos.
Nitrogen Generation Skid Package
Quantity: 3 Nos.

































Our engineering team is ready to discuss your fabrication requirements.